Bathroom Progress

 

 

 

 

 

 

 

 

 

 

 

 

Scott the Tile Guy has started putting up the tile in the shower area. It look great.

IMG_4818

 

Then I put up a first coat of Iced Teal paint. I’m so excited about the color. Garreth, Sue, and Debbie did some finish work. This is the linen closet door. The entrance door to the bathroom is a pocket door which allows for more open space in the bathroom

IMG_4824

 

 

Then Nemo the Storm came and blasted us with three feet of snow, and yes, it was everywhere.

IMG_4822

 

Next Up: closing up a wall in Aidan’s room, finishing the tile in the bathroom, and then we start digging up the front yard later this week to build the addition. It’s all so exciting!

Advertisements

About Heather Bowie

I’m the mother of two wonderful boys and have been married almost 20 years to an amazing Irishman I met in a castle. Our oldest son Liam loves to read and run. Our younger son Aidan loves to drive his power chair and socialize. Aidan has a rare genetic disease (PURA Syndrome) and Epilepsy. This blog was birthed out of the desire to tell our story, and in doing so, appreciate the journey.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s